- Go to the 'Master Company Settings' tab on the main menu on the left-hand side of the StaffWizard page.
- On the panel that was displayed, on the tabs that are on the top of the page, make sure you are on the "Master Controls" tab.
- On the left-hand side menu of the panel displayed, select the "Shift Specific Task" tab, and under the 'Shift Specific Task List' panel, on the right top corner, click on the blue [+Add New] button.
- A window will appear, and in here you can assign the title of the new task.
- Once you are satisfied with the title you can save the changes by clicking on the [Add] button at the bottom of the window.
- The new task will appear at the bottom of the branch list. Make sure the button on the 'Status' column is enabled on the task row to be activated.